Quick answer
After Checklist, spot-check the output, then decide whether to delete/archive the original; keep a backup. Checklist covers system/soil/permits/warranty.
Why it matters
A backup lets you roll back if the output is wrong.
System.
Step by step
- Check system/soil/leach field/permits/use/area.
- Separate tank/leach field/install/pumping/repair.
- Get 2-3 quotes; confirm system/permits/warranty.
- Contract states scope/permits/payment/warranty.
Common mistakes
- Tank only, not leach field.
- Ignoring soil/permits/area.
- Not checking pumping/maintenance.
- No permit/payment terms.
Checklist
- System/soil/leach field/permits/use.
- Tank/leach field/install/pumping.
- Soil/groundwater/area/code.
- Warranty/payment/contract.
- Budget/maintenance/emergency.
Key facts
- System.
- Soil.
- Permits.
FAQ
What should I do after Checklist?
After Checklist, spot-check the output, then decide whether to delete/archive the original; keep a backup. Checklist covers system/soil/permits/warranty.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Angi